Computer Access
a Training Module of the
Assistive Technology Division
Mississippi Department of Rehabilitation Services

 

Alternative Keyboards

Adaptive Keyboards

Ergonomic Keyboards

 

Device & Link

Info

Cost

Image

 

BAT Keyboard

Infogrip

http://www.infogrip.com/

Infogrip's BAT Keyboard is a one-handed, compact input device that replicates all the functions of a full-size keyboard, but with greater efficiency and convenience. The BAT is easy to learn and use. Letters, numbers, commands and macros are simple key combinations, "chords," that you can master in no time. Best of all the BAT's unique ergonomic design reduces hand strain and fatigue for greater comfort and productivity. The BAT is the ultimate typing solution for persons with physical or visual impairments and is proven to increase productivity when used with graphic or desktop publishing software. Macintosh version is NOT OS X compatible.

 

Dual $379.00

BAT Keyboard

Left $229.00

BAT Keyboard

Right $229.00

 

 

BigKeys Keyboard LX

Greystone Digital

http://www.bigkeys.com

BigKeys Keyboard by Greystone Digital Inc. is the size of a standard keyboard with 1" square keys, 4 times larger than a standard key. An easily accessible switch allows you to choose the keyboard layout that best fits your needs, QWERTY for standard use or ABC for easy learning. BigKeys is available in two versions Plus and LX. Big Keys Plus has 48 keys and is available in easy to read bright colors or black on white. BigKeys LX has 60 keys and is available in black on white. It also has Assist Mode, a built in sticky key feature, allowing you to enter multiple keyboard functions without simultaneous key presses.

 

 

$159.00

 

 

Contoured Keyboard

Kinesis

 

http://www.kinesis-ergo.com/

Kinesis' Contoured Keyboard separates the left and right hand sides of the keyboard into two concave sections or key wells. The key wells are designed to accommodate different finger lengths, shortening the reach to distant keys and preventing harmful wrist extension. The keys more frequently used by the weak fingers, such as Backspace and Enter have been located to the center under the thumbs.

The keypad is embedded into the right hand key well, which reduces key travel. Integrated into the keyboard design are palm supports, which provide a resting place for your hands. Some models of the Contoured Keyboard are programmable to reduce keystrokes and/or customize the key layout. All models accept a foot switch, which can emulate anything from the Shift key to a key sequence. (Professional model includes Programmable, Single Action Foot Switch)

 

 

Classic Programmable $289.00

Essential Non-programmable $239.00

Professional Programmable $349.00

 

 

 

Discover:Board

Madentec

http://www.madentec.com/

Discover:Board® by Madentec is the best alternative keyboard for the most needs. It works with any PC or Macintosh software and the Internet. Discover:Board does everything a regular keyboard and mouse can do. Discover:Board talks, so it can be used for learning and communication. It’s easy to adapt the Discover:Board to match individual needs, making keys talk, changing sizes and colors of keys or adding pictures or words to make communication easier. Use Discover:Board with pictures, pictures with text or just letters, depending on your needs. Included with Discover:Board are 5 standard overlays (Alphabetical, QWERTY, Numbers, Moving the Mouse and game playing with

$499.00

 

 

Discover:Kenx

Madentec

http://www.madentec.com/

Discover:Kenx® by Madentec is the all in one access solution. There is just one product to learn and it meets most students computer access needs. Discover:Kenex is a software and hardware combination that offers changeable input options. You can create computer access that’s totally customized to each student. Discover:Kenex supports multiple input methods, from direct selection to scanning, so you can move from a mouse to a switch to a head pointer to an alternative keyboard quickly and easily. Its on screen or alternative keyboard layouts have keys for typing text, moving the mouse, clicking hot spots on programs, opening folders and pulling down menus. Discover:Kenex is the access product of choice in educational settings and rehabilitation environments. Also available is the Multiple Switch Box allowing you to connect up to eight switches to your computer.

 

 

$899.00

 

 

 

Discover:Screen

Madentec

http://www.madentec.com/

Madentec's Discover:Screen is a talking on screen keyboard. It provides point and click access to standard keyboard letters, whole words and communication phrases. The Discover:Screen keyboard can show keys with letters, pictures or words.

 

$199.00

 

Discover:Switch

Madentec

http://www.madentec.com/

Mandentec's Discover:Switch does everything a regular keyboard and mouse can do. It puts keyboard and mouse layouts on the screen; the keys scan and you press Discover:Switch to select keys. Discover:Switch also takes advantage of speech technology so those who are non-speaking have a communication tool as well as a productivity tool. Discover:Switch has an alternative switch jack if a different type of switch is needed.

 

$599.00

 

 

ErgoFlex Keyboard

Comfort Keyboard

http://www.comfortkeyboard.com/

The Comfort™ Keyboard is the most adjustable keyboard available. It splits a traditional extended keyboard into three independently moving sections attached to a track, each capable of rotating 360 degrees and tilting 0 to 90 degrees. The order of the three sections can be arranged to meet your needs. You can program Comfort Keyboard: create macros, re-map the keys, adjust the key activation and set rest periods. Comfort Keyboard is also available with out a track, the ErgoMagic™ and the ErgoFlex™. The ErgoMagic’s three sections each have their own base, allowing you to adjust them in three different angles 20, 30 and 45 degrees, in four different directions and moved up to 6 feet apart. The ErgoFlex has the same qualities of the Comfort Keyboard. However, it has no base or mechanisms. ErgoFlex lays flat on a desktop or can be mounted to a chair. The sections can be separated up to 6 feet apart.

 

 

$189.00

 

 

 

ErgoMagic Keyboard

Comfort Keyboard

http://www.comfortkeyboard.com/

The Comfort™ Keyboard is the most adjustable keyboard available. It splits a traditional extended keyboard into three independently moving sections attached to a track, each capable of rotating 360 degrees and tilting 0 to 90 degrees. The order of the three sections can be arranged to meet your needs. You can program Comfort Keyboard: create macros, re-map the keys, adjust the key activation and set rest periods. Comfort Keyboard is also available with out a track, the ErgoMagic™ and the ErgoFlex™. The ErgoMagic’s three sections each have their own base, allowing you to adjust them in three different angles 20, 30 and 45 degrees, in four different directions and moved up to 6 feet apart. The ErgoFlex has the same qualities of the Comfort Keyboard. However, it has no base or mechanisms. ErgoFlex lays flat on a desktop or can be mounted to a chair. The sections can be separated up to 6 feet apart.

 

 

$199.00

 

 

 

Evolution Keyboard / Chair Mount

Kinesis

http://www.kinesis-ergo.com/

Evolution Keyboard is a split extended keyboard that can be used on a desktop or mounted to a chair. It separates the left and right hand sides of the keyboard into two separate pieces. Both left and right sides have a Spacebar and a palm rest. A built in touch pad can be located either on the left or right side depending on your preference. When mounted to a chair the Evolution Keyboard has three adjustable planes: wrist rotation, forearm length and keyboard height, which allows an infinite choice in positioning. Evolution Keyboard also allows you to re-map its keys.

 

 

$499.00

 

 

 

Evolution Keyboard / Desktop

Kinesis

http://www.kinesis-ergo.com/

Evolution Keyboard is a split extended keyboard that can be used on a desktop or mounted to a chair. It separates the left and right hand sides of the keyboard into two separate pieces. Both left and right sides have a Spacebar and a palm rest. A built in touch pad can be located either on the left or right side depending on your preference. When mounted to a chair the Evolution Keyboard has three adjustable planes: wrist rotation, forearm length and keyboard height, which allows an infinite choice in positioning. Evolution Keyboard also allows you to re-map its keys.

 

 

$299.00

 

 

 

Evolution Keyboard / Track Mount

Kinesis

http://www.kinesis-ergo.com/

 

Evolution Keyboard is a split extended keyboard that can be used on a desktop or mounted to a chair. It separates the left and right hand sides of the keyboard into two separate pieces. Both left and right sides have a Spacebar and a palm rest. A built in touch pad can be located either on the left or right side depending on your preference. When mounted to a chair the Evolution Keyboard has three adjustable planes: wrist rotation, forearm length and keyboard height, which allows an infinite choice in positioning. Evolution Keyboard also allows you to re-map its keys.

 

 

Left or Right$569.00

Right & Left $619.00

 

 

 

Expanded Keyboard

EKEG Electronics

http://www.ekegelectronics.com/

Expanded Keyboard by EKEG Electronics is a flat, smooth keyboard measuring 13" x 24" with a clear waterproof cover. The plastic cover can be peeled back to allow the use of overlays as well as allowing the keyboard surface to be easily cleaned. The keys are 1.5" square and are active over the entire key area. The keyboard uses a feature called "delay to accept", which allows you to adjust the time required for a character to be entered as well as the time before the key repeats. You can glide your hand; foot or a stylus over the keyboard and the key is not entered until you pause on the desired key for a preset amount of time. Once the key is entered a click is generated and a light flashes. A jack is built into the keyboard so that a speaker can be plugged into the keyboard for auditory feedback.

 

 

$750.00

 

 

 

Flexible Keyboard

Infogrip

http://www.infogrip.com/

Flexible Keyboard is water resistant and virtually indestructible. Its keys are not tactile so very little pressure is needed to activate the keys. Flexible Keyboard can be rolled up for storage, a great advantage for portable use or more desktop space. It is available in two sizes, Standard 19.6" X .03" X 6.9" or Short 16.2" X .03" X 6.9".

 

$60.00

 

Goldtouch Keyboard

Keytools

http://www.keytools.com

Goldtouch™ Keyboard splits into two sections in the middle allowing you to adjust the sections both horizontally and vertically. It may be adjusted horizontally from 0 to 30 degrees and vertically tented from 0 to 30 degrees. Goldtouch is designed with two large Spacebars allowing for easy thumb use and enhanced editing key layout for more comfortable keyboarding. The keys are full size, full travel, and low noise tactile keys with soft end stop. The small size of the Goldtouch Keyboard promotes synergy and ergonomic benefits for mouse use and comfort. An embedded numeric keypad or an optional external keypad is available.

$159.00

 

Goldtouch Keypad

Keytools

http://www.keytools.com

For number-crunchers, the Goldtouch numeric keypad can be placed where it's most comfortable. This enhances flexibility by allowing you to periodically change arm, hand and shoulder position.

The Goldtouch pad can also add important functionality to laptop computers, eliminating the need to use the 'dual-function' number and mathematical function keys in the built in keyboard.

This low-powered unit features a pass-through 'Y' adapter, allowing simultaneous connection of the main keyboard, without the need for extra cables or expensive adapters.

 

 

$69.00

 

 

 

Half Keyboard

Matias

http://www.halfkeyboard.com/

Now you can use your Palm™ to do your typing anywhere! The same size as your Palm™, the Half Keyboard allows you to type with just one hand, leaving your other hand free for other things.

The Half Keyboard by Matias is also great for desktop computer applications!

With the Half Keyboard under one hand and your mouse, trackball, or stylus in the other, there's no need to go back and forth between your input devices when working on CAD, desktop publishing, animation, image manipulation, spreadsheets, or even gaming.

Available for Palm™ m100, m105, III, V, VII Series, Handspring™ Visor, Deluxe, Platinum, Prism, Neo, Visor Pro, IBM WorkPad c3, HandEra, TRGpro, PC (Windows™ and Linux), and Macintosh™ (USB).

 

 

$295.00

 

 

 

Half Qwerty Keyboard

Matias

http://www.halfkeyboard.com/

Matias Corporation's Half-QWERTY keyboard allows for fast one-handed touch typing with either hand, as well as standard two-handed typing. To type with Half-QWERTY you place your hand on the keyboard, where it would normally be if you were touch typing. For letters of the other hand, simply hold down the space bar and do the finger movement the other hand would have done. Tapping the space bar still types a space.

 

 

$595.00

 

 

IGesture Mini Keyboard

FingerWorks

http://www.fingerworks.com

FingerWork's IGesture Mini Keyboard has zero force keys and measures 6.7" x 5.06". It combines the functions of a standard keyboard, mouse and multi-finger gesture in a single device. The familiar operations of typing, pointing and clicking are combined seamlessly with multi-finger gesture in the same overlapping area of the TouchStream's surface. With a IGesture you never have to reach for the mouse - it's always under your fingertips. Switching between typing, mouse and gesture is effortless and does not require you to move your hand or to input any special commands.

 

 

$219.00

 

 

 

iGesture Pad

FingerWorks

http://www.fingerworks.com

The iGesture Pad is an ultra-thin, large-area, superduper touchpad that is both mouse and powerful multi-finger gesture input interface. Mouse operations like point, click, drag, scroll, and zoom are combined seamlessly with multi-finger gesture in the same overlapping area of the iGesture Pad's surface. The iGesture Pad gives you unprecedented control of graphical objects using gestures, and it works equally well with either hand. Anyone can learn the basic gestures in a few minutes! Slips easily into your travel bag as the perfect external USB mouse/gesture interface for your laptop.

 

 

$159.00

 

 

 

IntelliKeys Keyguards

Intellitools

http://www.intellitools.com/

Are your students struggling to select the correct keys on overlays? Keyguards are the answer. These plastic frames are designed to clip on top of the standard overlays that come with IntelliKeys as well as on your own custom overlays. They provide physical seperation between keys so students can make more accurate choices.

Keyguards for Standard Overylays:
The clear acrylic keyguards lock onto your IntelliKeys for added sturdiness and ease-of-use. Individual keyguards are available for each of the Standard Overlays that come with IntelliKeys Classic and IntelliKeys USB.

Keyguards for Custom Overlays:
Eight layouts, sold in groups of four, are available. Just snap these onto your custom overlays. The Overlay Maker program provides templates to aid you in designing overlays to fit keyguard layouts.

96-hole Keyguard:
Available in clear acrylic, this versatile keyguard can be used with many of the pre-designed overlays that come with IntelliTools software.

Overlay Lock - NEW!
Four the times when you are not using a keyguard this handy device locks onto the top of your IntelliKeys and prevents students from pulling out overlays. It protects your overlays as well as helps keep students on track.

* USB Web and QWERTY keyguards are the same.

Provides spatial seperation for students with limited motor skill

 

 

Set of Five $200.00

 

 

 

IntelliKeys Keyboard

Intellitools

http://www.intellitools.com/

IntelliKeys by IntelliTools is a programmable alternative keyboard that plugs into any Macintosh or Windows computer. It enables students with physical, visual, or cognitive disabilities to easily type, enter numbers, navigate on-screen displays, and execute menu commands.

IntelliKeys was released by IntelliTools in the early 1990’s and was based on the Unicorn Keyboard. IntelliKeys is now one of the leading alternative keyboard device in the world with sales of over 55,000 boards. IntelliKeys is available in two flavors: a Classic and a USB version. (The USB model is Windows 2000 compatible.)

IntelliTools has created a keyboard that’s flexible enough to meet a wide variety of access and learning needs. Unlike the keyboard normally attached to the computer, the IntelliKeys look and functionality is changeable by sliding in different overlays. The IntelliKeys keyboard comes with six standard overlays plus a setup overlay, that are ready to use with any word processing program or software that has keyboard input. You can also use IntelliKeys with a growing number of commercial software programs made by IntelliTools and other publishers. Each of these programs come with their own custom printed overlays that work automatically when you load the software.

 

 

$395.00

 

 

Keyboard Skins

 

 

http://www.infogrip.com/

Keyboard skins are made from a polymer material designed to remain secure and in place at all times, while keeping your keyboard dry and dust free. They secure easily to the base of the keyboard and completely hug each key enabling you to maintain the feel of the keyboard. Keyboard skins are available for a wide number of keyboards. When placing an order for a skin please note the model and FCC number found on the bottom of your keyboard.

$30.00

Keyboard with Keyguard

 

 

http://www.infogrip.com/

The Keyboard with Keyguard isolates the keys, which helps to stabilize and position fingers or pointers. The keyguard is attached to the keyboard eliminating the guesswork of matching up a keyguard to a keyboard. The keyguard is reinforced for stiffness. It is made of unbreakable, clear, .125 inch thick Lexan (a plastic material). The keyholes are smoothly finished and perfectly aligned with each key.

Standard $180.00

Mini $150.00

Standard+Windows Keys $150.00

Key Largo

 

 

http://www.madentec.com/

Key Largo® by Madentec is an easy to use, expanded membrane keyboard that is used with Discover:Kenx. It does everything a regular keyboard and mouse can do. Key Largo talks, so it can be used for learning and communication. It’s easy to adapt the Key Largo to match individual needs, making keys talk, changing sizes and colors of keys or adding pictures or words to make communication easier. Use Key Largo with pictures, pictures with text or just letters. Included with are 4 overlays included and a clear plastic overlay protector and clip that holds the overlays securely in place.

$199.00

King Keyboard

 

 

http://www.infogrip.com/

The King Keyboard is a giant, 2.5" x 11" x 2.25", alternative keyboard that plugs directly into a computer -- no special interface is required. The keys are 1.25 inches in diameter, slightly recessed, and provide both tactile and auditory feedback. The King has a built-in keyguard so that you can rest on its surface without activating keys. This keyboard allows you to control both keyboard and mouse functions, so it's great for people who also have difficulty maneuvering a standard mouse. All mouse directions, click, double click and drag functions are performed by pressing directly on the keyboard keys while in Mouse Mode.

Frequency of Use $925.00

WinKing Qwerty $925.00

Large Print / Braille Keyboard Labels

 

 

http://www.customkeys.com/

Key Connection's labels make a standard keyboard more accessible for visually impaired individuals with large print or Braille keyboard labels. The characters on the large print labels are .5" by .25", about 3 times larger than standard keyboard characters. The Braille labels are available as clear labels with Braille dots or large print with Braille. Each set includes all the keys used on a standard Windows keyboard.

Black on Ivory $29.00

Black on Yellow $29.00

Braille $29.00

Black on Ivory $29.00

Large Print Keyboard

 

 

http://www.customkeys.com/

Key Connection's Large Print Keyboard is a standard Windows keyboard with large print keys. The keyboard and its keys are the same size as a standard keyboard; however, the print has been enhanced. The characters measure .5" by .25", about 3 times larger than standard keyboard characters.

Black Keyboard with White Keys $130.00

White Keyboard with Black Keys $130.00

Little Fingers Keyboard

 

 

http://www.datadesktech.com/

Datadesk's Little Fingers™ Keyboard is a small 101-style keyboard designed specifically for small hands to easily reach all of the keys. The keys are 20% smaller than traditional keys and the keyboard spacing is more compact. Little Fingers is available in two models: Little Fingers Combo with a built in three-button trackball and Little Fingers has a numeric keypad. The trackball eliminates the need for a separate mouse allowing you to point and click without moving your hands from the keyboard. Little Fingers measures 12.5" x 7" without the wrist rest.

NOTE: ALL COMBO AND ALL USB VERSIONS ARE BACKORDERED WITH NO ETA. BACKORDERS ARE WELCOME BUT WE CANNOT GUARANTEE DELIVERY TIME. LITTLE FINGERS STANDARD WITH KEYPAD STILL AVAILABLE.

Combo $80.00

Standard $60.00

Low Profile Keyboard

 

 

http://www.shentech.com

Low Profile Keyboard by Solidtek is a compact 101-style keyboard that is similar in size and feel to a laptop keyboard. It compresses the rows and columns into a compact unit and eliminates wide borders. The keypad and function keys are embedded into the keyboard to cut down on size and key travel. The keyboard is lightweight and has folding feet which when opened give you an elevation of about 1".

$85.00

X-Keys Foot Pedals

 

http://www.xkeys.com/

PI Engineering's X-Keys Foot Pedals act as a three-button programmable keyboard in conjunction with your regular keyboard. It lets your feet take over lengthy, awkward or painful repetitive keystrokes or mouse clicks. Key actions like Shift, Enter and Space can be re-mapped and entered with one of the three-foot pedals. Each pedal can also be programmed to handle macros or key sequences of up to 13 characters in length.

$119.00

Space Saver Keyboard

 

 

http://www.datalux.com/

Datalux's Space Saver Keyboard is a 100 key keyboard that measures 10.80" x 6.10", 40% less desk space used than a standard keyboard. Space Saver compresses row spacing eliminating wide borders and rearranging key clusters. The keypad, cursor and function keys are located above the alphanumeric, editing and punctuation keys, allowing for eye scan without head movement. The Desk model is weighted to hold it in position and is slightly elevated 2.55" to improve accessibility to the keypad, cursor and function keys. The Flat model is not weighted and has folding feet, which when opened give you an elevation of about .75".

Desk Model $125.00

Desk Model with Touch Pad $169.00

Symbi-Key Computer Interface

 

 

http://www.elmetec.dk

Symbi-Key is a PC switch interface capable of handling up to 9 switches. It is simple to program and easy to use. Symbi-Key can be used with an IBM or compatible computer and will work equally well in DOS or Windows. You can quickly program any key, function or series of keystrokes for single switch activation. In addition, Symbi-Key has the ability to hold 27 pre-programmed switch functions. Connection is hassle-free, Symbi-Key plugs into the keyboard port and does not affect keyboard use.

$199.00

TouchStream LP Keyboard

 

 

http://www.fingerworks.com

The low profile TouchStream LP by FingerWorks is an ST without the tented frame and gel pads. Thanks to the rugged flex cable between the two halves the LP folds up into a small package for easy traveling. You can even place the LP over your notebook's keyboard and instantly transform your notebook into a mobile TouchStream. The LP can also be converted to a Stealth for desktop use with an optional tented metal frame.

$339.00

X-Keys Keypad

 

 

http://www.xkeys.com/

PI Engineering's X-Keys is a compact programmable keypad, designed as an auxiliary keyboard. It makes it easy to save multiple keystroke or complex commands (macros) to a single keystroke. X-Keys is easy to program, using key-to-key programming from the main keyboard. Its key caps are clear and easy to remove allowing you to create, apply and reapply custom legends. There are two models available, a 20 key which stores up to 39 macros or a 58 key, which stores up to 115 macros.

20 key $105.00


58 key $160.00

USB Mini Keyboard

 

 

http://www.tashinc.com

Tash's USB Mini Keyboard is a small QWERTY keyboard measuring 7.25" x 4.5" x 1". The keyboard surface is very sensitive with membrane keys that are less than .5" square and are closely spaced for easy access. Auditory feedback is provided when a key is pressed. The USB Mini also has a Mouse Mode Key, which allows you to move the mouse in all directions and have access to right and left click, double click and drag functions. The keyboards response rate, key repeat rate and mouse tracking speed are all adjustable.

$775.00

 

 

Return to Computer Access Page

Return to AT Training Models Page

Return to AT Training Models Page