the Physical Computer
a Training Module of the
Assistive Technology Division
Mississippi Department of Rehabilitation Services
IDE Devices
Hard drives are the primary storage devices in the PC. Internal drives are typically where all files including the Operating System are located. There are also external hard drives that are used for backups, file archiving, and file transfers. The two main types of hard drives are IDE (or EIDE) drives and SCSI ) pronounced "scuzzy. The IDE drives are the more common of the two types. A typical motherboard has two IDE controllers that can have two devices per controller. The drives are designated as "master" and "slave" on each controller.
![]() |
The business end of a hard drive: The IDE ribbon cable connects to the pin connector. The 4 pin Molex power connector attaches on the right. In the middle are examples of jumpers used to establish master/slave status. |
![]() an IDE ribbon cable end connection |
![]() a full IDE ribbon cable |
connecting an IDE cable to the drive |
Primary and Secondary IDE connectors on motherboard |