Computer Access
a Training Module of the
Assistive Technology Division
Mississippi Department of Rehabilitation Services
Keyboard Shortcuts
The keyboard shortcuts listed below are typical shortcuts available in Windows operating systems. There are many other kinds of shortcuts...some that only work in specific Microsoft products or in third party software programs or in adaptive software packages. The keyboard combinations are divided into sections based on the type of keys used in the combinationas...Control Key Combinations, Alt Key Combinations, Function Keys, Windows Key Combinations, Shift Key Combinations, and Miscellaneous Shortcuts.
Click on this link to check out other keyboard shortcuts at Microsoft's website.
| Control Key Combinations | ||
Function |
Key Combination |
Learning Tools |
Move the insertion
point to the beginning of the next paragraph. |
Control + Down Arrow |
|
| Move the insertion
point to the beginning of the previous paragraph. |
Control + Up Arrow |
|
Move the insertion
point to the beginning of the previous paragraph. |
Control + Up Arrow |
|
| Move the insertion
point to the beginning of the previous word. |
Control + Left Arrow |
|
Copy |
CTRL +
C |
copies highlighted material to the Clipboard remember C for Copy |
Cut |
CTRL +
X |
removes highlighted material from the text and copies it to the Clipboard remember X as in X it out |
Paste |
CTRL +
V |
Pastes material from the Clipboard remember V looks like the symbol "insert here" |
Undo |
CTRL –
Z |
just like
the Undo button on the Menu Bar, it will undo the last action performed |
Redo |
CTRL -
Y |
just like
the Redo button on the Menu Bar |
Create shortcut to
selected item. |
CTRL+SHIFT while dragging an
item |
|
Highlight a block
of text. |
CTRL+SHIFT with any of the arrow
keys |
|
Move forward through
tabs in a dialog box. |
CTRL+TAB |
|
Move backward through
tabs in a dialog box. CTRL+SHIFT+TAB |
CTRL+SHIFT+TAB |
|
| Alt Key Combinations | ||
Function |
Key Combination |
Learning Tools |
Switching Applications |
ALT + TAB |
Tapping the TAB key to cycle between open applications. |
Switch MouseKeys
on and off. |
Left ALT +left SHIFT +NUM
LOCK |
|
Switch High Contrast
on and off. |
Left ALT +left SHIFT +PRINT
SCREEN |
|
Close the active
item, or quit the active program. |
ALT+F4 |
Very important closing mechanism
for non-mouse users |
View properties
for the selected item. |
ALT+ENTER |
|
Display the System
menu for the active window. |
ALT+SPACEBAR |
|
Switch between
open items. |
ALT+TAB |
|
Carry out the
corresponding command or select the corresponding option in a dialog box.
|
ALT+Underlined letter |
Critical option for using
Microsoft Menus without a mouse |
Display the corresponding
menu. |
ALT+Underlined letter in a
menu name |
Critical option for using
Microsoft Menus without a mouse |
| Function Keys | ||
Function |
Key Combination |
Learning Tools |
Display Help in
a dialog box. |
F1 |
|
Rename selected
item. |
F2 |
|
Search for a file
or folder. |
F3 |
|
Display the Address
bar list in My Computer or Windows Explorer. |
F4 |
|
Display the items
in the active list in a dialog box. |
F4 |
|
Refresh the active
window. |
F5 |
|
Cycle through
screen elements in a window or on the desktop. |
F6 |
|
Activate the menu
bar in the active program. |
F10 |
|
Display the shortcut
menu for the selected item. |
SHIFT + F10 |
|
| Windows Key Combinations | ||
Function |
Key Combination |
Learning Tools |
Start Menu |
Windows Key
|
same as
hitting the Start button
|
Windows File Explorer or My Computer |
Windows Key + E |
opens Windows File Explorer/My Computer remember E for Explorer |
Windows Search |
Windows Key + F |
opens the Windows
Search for... applet
remember F as in Find |
Minimize all open windows |
Windows Key + M |
minimizes all open windows and places focus on the desktop, remember M for minimize hit any letter on the keyboard and the focus will go to an icon starting with that letter after getting to program that you want, hit the enter button to open it |
Restores minimized
windows. Windows Key+Shift+M |
Windows Key + Shift + M |
restores minimized windows |
Show the desktop.
|
Windows Key + D |
takes you to the Desktop,
minimizing all windows, remember D for Desktop |
Display Windows
Help. |
Windows Key + F1 |
|
Open the Run dialog
box. |
Windows Key + R |
remember R for Run |
Opens Utility
Manager. |
Windows Key + U |
this Utility Manager controls
Microsoft Accessibility Applets, remember U for Utility |
Set focus on a notification.
|
Windows Key + B |
|
| Shift Key Combinations | ||
Function |
Key Combination |
Learning Tools |
| Switch FilterKeys on and off. | Right SHIFT for eight seconds | Filter Keys is an accessibility feature |
| Switch StickyKeys on and off. | SHIFT five times | Sticky Keys is an accessibility feature |
| Prevent the CD from automatically playing. | SHIFT when you insert a CD into the CD-ROM drive | This turns off the AutoRun feature |
| Select more than one item in a window or on the desktop, or select text within a document. | SHIFT with any of the arrow keys | |
| Delete selected item permanently without placing the item in the Recycle Bin. | SHIFT + DELETE | Beware...this removes the item completely. |
| Move backward through options in a dialog box. | SHIFT + TAB | |
| Miscellaneous Shortcuts | ||
Function |
Key Combination |
Learning Tools |
Select a button
if the active option is a group of option buttons in a dialog box. |
Arrow keys |
|
View the folder
one level up in My Computer or Windows Explorer. |
BACKSPACE |
|
Open a folder
one level up if a folder is selected in the Save As or Open dialog box
in a dialog box. |
BACKSPACE |
|
| Delete. |
DELETE |
deletes the highlighted item
or text |
Display the top
of the active window. |
HOME |
takes focus to the beginning |
Display the bottom
of the active window. |
END |
takes focus to the end |
Carry out the
command for the active option or button in a dialog box. |
ENTER |
example: if focus is on a shortcut
for a progra, Enter will run that program |
Cancel the current
task. |
ESC |
|
Open the next
menu to the left, or close a submenu. |
LEFT ARROW |
|
Collapse current
selection if it's expanded, or select parent folder. |
LEFT ARROW |
|
Display the shortcut
menu for the selected item. |
Menu key |
this key is located to the right of the right Windows key this acts like a right click on the selected item, it opens the sub-context menu for that item |
Switch ToggleKeys
on and off. |
NUM LOCK for five seconds
|
|
Display all subfolders
under the selected folder. |
NUM LOCK + ASTERISK on numeric
keypad (*) |
|
Collapse the selected
folder. |
NUM LOCK + MINUS SIGN on numeric
keypad (-) |
|
Display the contents
of the selected folder. |
NUM LOCK + PLUS SIGN on numeric
keypad (+) |
|