Computer Access
a Training Module of the
Assistive Technology Division
Mississippi Department of Rehabilitation Services
Hardware for Low Vision
| Device & Link |
Info |
Cost |
Image |
Large Print / Braille Keyboard Labels
|
Key Connection's labels make a standard keyboard more accessible for visually impaired individuals with large print or Braille keyboard labels. The characters on the large print labels are .5" by .25", about 3 times larger than standard keyboard characters. The Braille labels are available as clear labels with Braille dots or large print with Braille. Each set includes all the keys used on a standard Windows keyboard. |
Black on Ivory
$29.00
Black on Yellow $29.00 Braille $29.00 Black on Ivory $29.00 |
|
Large Print Keyboard
|
Key Connection's Large Print Keyboard is a standard Windows keyboard with large print keys. The keyboard and its keys are the same size as a standard keyboard; however, the print has been enhanced. The characters measure .5" by .25", about 3 times larger than standard keyboard characters. |
Black Keyboard
with White Keys $130.00
White Keyboard with Black Keys
$130.00 |
|